Disco2Guy Posted March 16, 2008 Report Share Posted March 16, 2008 Well now technically it was yesterday. My friend Chris and I drove up to San Rafael to do the work in a friends auto shop garage. It all went without a hitch, even the RivNuts. It took about 3 hours to get the first one on and 45 minutes for the other side. Now RovrFlo is ready for the April MORG, and hopefully by May I'll have the CDL shifter installed. I'm glad I got the slider step too. It'll be a lot easier to get the surfboards up and down with wet booties on. Link to comment Share on other sites More sharing options...
Disco12 Posted March 16, 2008 Report Share Posted March 16, 2008 looking good!:cool: Link to comment Share on other sites More sharing options...
esteban Posted March 16, 2008 Report Share Posted March 16, 2008 Sweet! I found the same thing when I installed mine. The first one takes awhile because you're following the instructions, then the second one goes a helluva lot faster because you ditch the instructions and slam it out..... Steve Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.